goalkeeper
2019-10-17 09:56:01
- #1
The crane has been gone since early this morning. Fortunately, the guys were moving quite quickly, so the foundations could still be poured beforehand. That was very important, otherwise the heavy formwork panels would have had to be assembled and disassembled with the excavator. So now only the floor slab is missing, and then the masonry will begin.
In the picture, you can clearly see the height difference.

In the picture, you can clearly see the height difference.