It is a flat rate of €3000 for material and additional effort, since the corners allegedly still have to be filled with acrylic plus €700 net for 15 hours of sanding giraffe – both versions are painted. Allegedly, he needs a different paint that also costs more.
 

Winniefred

2020-03-26 12:59:24
  • #2
I would stick with the 4s. We have a small bathroom and even 6 lights. But in the bathroom I need it really bright. Otherwise, I’m not like that, but in the bathroom it was important to me and we’ve never regretted it. Mirror lighting is something separate for me anyway, I would consider that independently from the other spots.
 

K1300S

2020-03-26 13:00:49
  • #3
So he means that the substrate for the painter's fleece has to be prepared differently (more elaborately)?
 

Golfi90

2020-03-26 13:03:38
  • #4
That would be my next question. Then the substrate will actually be "better" prepared than with the textured wallpaper. But just sanding with the giraffe does nothing, he also has to do some filling...
 

goalkeeper

2020-03-26 13:04:12
  • #5


No... just sand the plaster a little to make it smooth. The surcharge for Q3 would be another €5.50 per sqm.
 

goalkeeper

2020-03-26 13:08:11
  • #6
It is 15 hours of sanding and filling in the 700 €. However, not to Q3 standard, just to fill/close holes.
 

Similar topics
20.02.2018Foundation/Substrate WPC Terrace36
18.05.2020First move in - then plaster, paint, and install flooring12
01.09.2020Subfloor Preparation Click Vinyl19
12.08.2021Have Q2 smoothly plastered onto Q3 or use painter's fleece42
25.07.2020Drill holes in textured wallpaper - should they be filled and painted over?10
21.07.2022Spackling Q2 / 2 coats of paint - sufficient?42

Oben