Slowly but surely, it's progressing. I can't see any more Keystone modules. Connecting them is now second nature. All the LAN cables pulled so far are connected to the patch panels. The installation inside the cabinet is not final yet because more cables will be added and I might still move the cabinet a bit. Not all patch cables are connected yet. Tomorrow I will start up the router and switch and make some changes to the configuration. I will install the remaining components later.

The installation of the substructure for the ceiling is also ongoing. The HLS guys placed a couple of pipes too low. They are allowed to change that next week...