Meanwhile, the hole between the house and the pavilion has been filled, compacted, and reinforced with iron. Today, the terrace is scheduled to be concreted. All rainwater will be directed into the cistern.
I am now a pro at cleaning windows. Since the windows were partly on the construction site for a year, they can only be properly cleaned with strong cleaning solution and a glass scraper. I also found a few small scratches. These will be polished out later. Later, the windows will only be cleaned with pure water. For this purpose, I got myself a small reverse osmosis system. It also works for the facade.
At the same time, the commissioning of the home automation is underway. First, the rudimentary functions... The access system as well as the surveillance system are already running. Later, two more cameras and some sensors will be added.
The next item is floor cleaning. Unfortunately, my scrubber-dryer machine still hasn’t been delivered. So, it’s manual work. The kitchen installers were also here yesterday to take a look. They want to start next Monday. Appliances will probably come later. Currently, white goods have long delivery times since the ships with new goods have not yet arrived.