Today the cistern was finally installed. Currently, a lot of rebar is being placed on the ceiling. Next week, the concrete will be poured, followed by the last and smallest floor. Additionally, filling is slowly beginning, and the concrete walls for the pool should also be set soon. Hopefully, the weather holds out long enough to finish the floors and the windows.
