Bauhaus concrete villa with core insulation - experiences

  • Erstellt am 2018-09-11 07:32:07

rick2018

2019-12-05 13:41:32
  • #1
The Swiss clockwork continues to tick precisely
As correctly pointed out in another thread, a lot of love for detail and the best materials are used.
Nicely sealed:


Today, the panes were installed which will have no contact with the cast asphalt. For example, in the pavilion.
(small) pane on the hook:


Panes inside:


This can continue like this. If it works out with the supplier tomorrow, I will be happy.
Currently, the winter windows are still being installed so that interior work can begin.
 

Tina mit K

2019-12-05 13:56:46
  • #2
Oh, you already have the Winter Wonderland in full swing, judging by the trees in the background. How cold is it over there? I always feel sorry for the construction workers in such weather. Hopefully, everything goes smoothly with the [Versorgern]. Some employees there can be a bit difficult.
 

rick2018

2019-12-05 14:02:58
  • #3
Last night it was "only" -4 degrees. Yesterday -8. Currently, the sun (as already yesterday) is shining through and the sky is a radiant blue. In the sun, a pleasant 4-6 degrees. But it has only been like this for 2 days. The week before was consistently above freezing.
 

tumaa

2019-12-05 14:35:24
  • #4


Somehow I feel sorry for the craftsmen when I see the weather, even though the heat is much more dangerous.
 

Climbee

2019-12-05 15:58:16
  • #5
This is going to be really, really great!
 

rick2018

2019-12-05 18:37:20
  • #6
The weather isn’t that bad at the moment. I was also on the construction site for several hours today. A thick jacket and warm shoes are enough. And the men are still moving. From noon it was completely sunny as well.

Thanks
This is how it looked this evening. The winter windows are already installed on the ground floor. Now it doesn’t draft as much anymore

 
Oben