Once again a short sign of life from me.
The HVAC installation is progressing well. The controlled residential ventilation and gas boiler are installed. However, some things are still missing. Part of the installation will be in the pavilion.
![]()
The garden water installation is also still missing. The remaining space will then be used by the pool builder.
The electricians are also busy pulling wires. Some network cables are already laid. The advantage is that no chasing is necessary anywhere because all the empty conduits are embedded in the concrete. The picture is already a few days old. It shows approximately half of the LAN cables. Rails will also be added later.
![]()
The components for the photovoltaic system are also here. Let’s see when we can get them onto the roof...