Bauhaus concrete villa with core insulation - experiences

  • Erstellt am 2018-09-11 07:32:07

Climbee

2020-11-13 08:09:32
  • #1
Exactly, back to topic.

I am waiting until the cleaning is done and it continues with [Innenbilder]. I am very excited!
 

rick2018

2020-12-13 20:53:19
  • #2
Winter is/was at least there once.





Therefore, new equipment was needed as well :p Men and toys. But it also serves integration. Somehow everyone here has a tractor, lawn tractor...
Of course, there was more accessories too. Nikolaus had a big sled with him ;)


Inside, it continues as well. The guest room is finally finished. Now the decoration continues. It's getting there very slowly...


 

WingVII

2020-12-13 21:04:24
  • #3
Wow, it all really comes together. The guest room looks great.
 

Bertram100

2020-12-13 21:09:28
  • #4
The pool in winter :) Really great! Have you been in it since the temperatures can be called winter temperatures?

The rest is also great. Especially the floor. :) How lucky that it is (almost?) everywhere in the house. I really like it.
 

matte

2020-12-13 21:10:21
  • #5
What temperature is the water? Looks really great!
 

rick2018

2020-12-13 21:11:57
  • #6
The pool is currently not heated. I wouldn't have been able to swim with the broken foot anyway. The floor is everywhere (except for the technical room and the electrical/server room).
 

Similar topics
01.01.2010Ground-level pool instead of bathtub?19
24.10.2016Room in Pool Concept21
08.01.2019Heating solution for large single-family house with pool31
22.08.2022Pool in the garden? - Need inspiration!73
30.04.2022Floor plan of a semi-detached house with a guest room53
19.07.2023Drain the pool - experiences - ideas?28

Oben