Bauhaus concrete villa with core insulation - experiences

  • Erstellt am 2018-09-11 07:32:07

apokolok

2019-07-24 21:37:18
  • #1
I love your project. The view of the landscape is great, I can already well imagine sipping coffee in the morning looking over it. Of course, this house is a contrast, but as you say, it would be like that almost everywhere. Incredibly large amounts of gravel are being used there with you, do you have a rough idea of what volume that is so far?
 

Muc1985

2019-07-24 22:00:06
  • #2
Very nice update Rick and your detailed text absolutely reflects your top approach.

Best regards
 

rick2018

2019-07-24 22:21:56
  • #3

I always imagine that too when I am on the construction site
Especially in this weather, I like to stand on the step of the future pool.
I can’t tell you the exact volume of the gravel but according to the last calculation there are just under 1500 tons of gravel in the house and garage area. In the terrace/pool area we will also need some more.
We excavated 2500m3 of soil. Loose it was of course more. I believe the loosening factor is 1.25.


I’m sure it will go just as meticulously planned with you
 

rick2018

2019-08-03 09:18:54
  • #4
So, here is a new update.
Yesterday, for the first time, something was seen rising above ground.
The men erected the retaining wall at the driveway. I was a bit shocked by the size/height even though I know the plans. More than a meter still disappears underground...
Since the crane did not have sufficient capacity and strength, a small mobile crane was used. The large elements (hollow wall) weigh 4.5 tons.
The clean layer for the house/garage foundation is finished. Today, the foundation at the entrance was poured and reinforcement work continues. The construction site will be idle for the next two weeks. Some people are on vacation and others are assigned to different construction sites. During this time, the concrete parts for the house/garage will be produced.



 

Schlenk-Bär

2019-08-03 09:42:10
  • #5
Could you please explain this point in more detail? It will be similar for us, especially the point about the building line. Thank you!
 

Muc1985

2019-08-03 09:43:19
  • #6
Great progress. Always great to read your updates.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
30.11.2016Foundation for garden house15
26.04.2016Sand, gravel, and other earthworks32
23.07.2016Construction of the driveway with gravel, crushed stone, and paving18
16.07.2017Plot with terrain drop - separating wall neighbors - foundation?44
02.09.2017Build over gas, water, electricity, and telephone lines with a garage?13
25.06.2018Heat pump foundation too close to garage, repair or new construction?10
11.10.2018Waste on the construction site - What is tolerable?138
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
05.05.2020New building with general contractor garage built too small, what to do?35
19.08.2021House building - an eternal construction site?33
09.11.2021Cost check foundation garden house 4x413
16.01.2022Earthworks. How do you calculate gravel and excavated soil?10
18.06.2023Offer double garage 6x9 m / foundation + floor slab24
29.11.2023Compacting gravel without a vibrating plate20
07.02.2024What foundation is needed for a garden wall?21
08.05.2024Retaining wall 60 cm high - foundation necessary?12
14.09.2024Steel fence including foundation broken / tilted11
23.02.2025Compacted gravel with gravel cells as a parking space?13

Oben