So, here is a new update.
Yesterday, for the first time, something was seen rising above ground.
The men erected the retaining wall at the driveway. I was a bit shocked by the size/height even though I know the plans. More than a meter still disappears underground...
Since the crane did not have sufficient capacity and strength, a small mobile crane was used. The large elements (hollow wall) weigh 4.5 tons.
The clean layer for the house/garage foundation is finished. Today, the foundation at the entrance was poured and reinforcement work continues. The construction site will be idle for the next two weeks. Some people are on vacation and others are assigned to different construction sites. During this time, the concrete parts for the house/garage will be produced.