  • #1
Unfortunately, things have not progressed as hoped yet. We had to take soil samples again. You can still see the excavations. Hopefully, everyone is finally satisfied now and we are allowed to deliver to the planned landfill. The trees are gone and the men are starting with the construction road.
 

rick2018

2019-06-03 07:07:00
  • #2
Due to weather and holidays, progress was slow. The construction road and partially the substructure for our driveway as well as the space for the crane are completed. Today, the crane is to be surveyed. Tomorrow, the delivery of the Ego T 85 A (45 meters) is scheduled.
 

apokolok

2019-06-03 10:25:17
  • #3
Good that the crane area is properly compacted
Very interesting your thread, may the weather and everything else remain in your favor.
 

DASI90

2019-06-03 10:30:51
  • #4


Yes, crane sites must be compacted. As long as they have a proper tape measure, that works. Otherwise, they are genuine incompetents.

By the way , I am always quite impressed by your drone photos. What do you fly around with to get such pictures?
 

rick2018

2019-06-03 10:47:18
  • #5
The men are doing it right. Flow, frost protection gravel + fine gravel and then well compacted. Currently, they are digging further back since we need it anyway and so that the trucks with the crane can drive in tomorrow.

Thanks for keeping your fingers crossed that it is moving forward now and that the weather cooperates.

I am flying with a DJI Mavic 2 Pro. It has a 1” sensor.
Mostly, the photo settings are on automatic since it is only for documentation.
Cropping, removing metadata, etc., then in Capture One Pro.
 

DASI90

2019-06-03 10:49:44
  • #6
By the way, the crane place comment was only meant ironically and with reference to a Polier legend you can see on YouTube. But the perfect setup was really good too.
 

Similar topics
10.11.2016Dismantling of a construction road24
16.07.2019Cost of construction of access road and removal of excavated soil34
04.06.2019Construction road runs on our property10
30.10.2019Liability waiver for construction road should be signed14
01.05.2020New construction - Fence for the construction road and neighbors10
29.10.2020When is land development? Before construction road or after removal51
01.12.2020Cistern directly on construction road - risk of damage?16

Oben