Wait with the building application because of the child construction allowance

  • Erstellt am 2018-02-06 10:41:40

blaupuma

2018-08-06 19:19:46
  • #1
3 months

Assembly line work from abroad?

We are building 230m2 solid as a bungalow.

The contractor needs 6 months (up to 160 m2). He wants to have 8 months for larger houses (may).

I find that okay. Better calmly and properly!?
 

Janw1234

2018-08-06 19:29:24
  • #2

Building with Viebrockhaus. It's quite tightly scheduled, but it works and they are really not known for poor quality, rather the opposite.
 

HausbauTiNa

2018-08-06 19:29:48
  • #3
Thank you very much for the link and the report. If the State Secretary is right, we will come away empty-handed. My wife was paid severance due to the site closure, and I cashed out an extreme amount of overtime this year. The thanks: limit exceptionally exceeded in 2019.
 

HilfeHilfe

2018-08-06 19:41:42
  • #4
Moved in 2014. Do I get anything too??
 

yellow_ms

2018-08-06 19:55:05
  • #5
Our average 2017/2018 through the severance pay 106k, limit with two dwarfs 105k Well, sometimes you’re the dog, sometimes you’re the tree.
 

Janw1234

2018-08-06 19:55:58
  • #6
No.
 
Oben