KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 464

  • Erstellt am 2022-01-24 09:48:19

hauskauf1987

2022-01-25 15:08:51
  • #1
It doesn’t matter You can also sign your contract for work in 2 years
 

Hausbau 55

2022-01-25 15:18:03
  • #2

You should be totally relaxed. Please read my previous posts here. With the commitment, you are on the sunny side.
We will probably move into the new KfW-Efficiency House 55 EE (bungalow) in February. So far, the missing heat pump was the problem, but it should arrive shortly. We had no obligation for a photovoltaic system, yet a 13.68 kWp system is already running. In combination with a heat pump, this is a perfect decision. I planned the photovoltaic system largely by myself without much prior knowledge and organized the implementation. I stayed under 1,100 EUR/kWp. It works with a dose of realism and willpower.
 

Tassimat

2022-01-25 15:21:22
  • #3

Well, doesn't the construction have to be completed within 2 years, otherwise the funding expires? Taking unlimited time is not an option.


Sorry, but then build without the €75k subsidy for 2 residential units. Then only KFW55 standard, you are down to €50k or something like that. Alternatively, pause house construction and wait for new funding, but then there is the risk of increasing requirements.
 

Hausbau 55

2022-01-25 15:21:23
  • #4
Yes, you have done everything correctly. The construction contract must generally not be signed before the approval.
 

tamer.darweesh

2022-01-25 17:01:07
  • #5


Does it make a difference whether an employee or the system disadvantaged me?

If someone complains, it would speak against the decision-maker that the used system is not fair.

In a system with limited resources, the principle "first come, first served" usually applies, unless there is another defined priority.
 

Seb_Opf

2022-01-25 17:10:20
  • #6


Insert a space and write at instead of @ so bots don't notice it




Yesterday, I was told at the hotline that I am allowed to sign my construction contract but construction is only allowed to start after a possible funding approval...

Example:

Today: Signature at the developer
August: New funding can be applied for
Feb 23: Start of construction
 

Similar topics
08.06.2017Photovoltaic system, how to use experiences like heat pumps?64
21.06.2016Heat pump with photovoltaics vs gas and solar thermal52
10.07.2016Air-water heat pump with photovoltaics or pellet with solar25
03.01.2017Preparation for photovoltaic or solar thermal with air-water heat pump18
22.05.2017New build bungalow - air-water heat pump, photovoltaic and solar thermal?17
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
07.05.2020Collaboration of air-water heat pump, photovoltaic system, and storage38
20.01.2020New BAFA funding - Air-to-water heat pump with solar thermal39
10.11.2021Photovoltaic system: Costs, saving potential? - Experiences?240
05.05.2020Photovoltaic system + storage with or without cloud tariff13
29.03.2020Commissioning of 9.3 kWp system combined with air-to-water heat pump and controlled residential ventilation10
08.05.2020Heat pump + photovoltaic system with or without storage11
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
24.02.2022Photovoltaic system air-water heat pump - profitability single-family house KFW55EE95
02.06.2022Promotion of photovoltaic systems Easter package108
25.03.2022Switching from gas to solar / photovoltaic with / without heat pump31
10.07.2023Is the replacement of the roof window in the bathroom included in the subsidy for the heat pump?10
22.03.2024Should photovoltaic design be considered with the heat pump or not?20
04.03.2024Costs for heat pump and photovoltaic in 2024 in small old buildings20

Oben