Floor plan optimization city villa + fill consideration

  • Erstellt am 2020-01-31 13:29:27

pagoni2020

2020-07-28 18:14:54
  • #1
I wouldn't worry too much about that. I wasn't familiar with the term either, but Google explained it to me. If needed, a kitchen installer can nicely panel or fit all kinds of things, or you can do it in lightweight construction. Since the kitchen plan will be available in time, the mason/plasterer can do it if it's actually necessary at all; or, as mentioned, just cover it. I think this kitchen installer might not do it...-, but he will definitely recommend the new Bora cooktop, see the current thread by - and see no issues there -
 

ypg

2020-07-28 18:16:32
  • #2


Drywall work.



The fridge has ventilation flaps. Doesn't every appliance have a right to air circulation?
 

Tolentino

2020-07-28 18:50:10
  • #3
Here in Berlin, we also submitted without finished structural analysis.
 

DASI90

2020-07-28 19:01:35
  • #4
The structural engineer only has to sign the building permit to confirm that the structural stability is ensured. The correct structural design will be developed during the detailed planning phase in coordination with the architects, provided it is not already fully planned in detail.
 

Tarnari

2020-07-28 19:03:40
  • #5
That's true, it might also have been like that. We submitted the application last year in June. Maybe I remember it incorrectly.
 

haydee

2020-07-28 21:29:18
  • #6
We submitted with structural analysis. (Bayern). Makes sense too. The structural analysis shifted and raised the house a bit.
 

Similar topics
29.01.2014City villa floor plan / Feedback on static analysis, arrangement28
05.07.2018Final costs only after structural analysis and heat demand calculation?12
18.09.2019Build the garage yourself - Calculate the statics?28
16.12.2019What is the cost of the structural analysis for a single-family house?24
07.05.2020Statics/Energy Saving Ordinance Is the offer fair?14
04.01.2023Retaining wall 2 m high without static report?10
26.03.2021Building with different stones than in approval planning and structural analysis12

Oben