Floor plan planning shortly before submitting the building application

  • Erstellt am 2017-10-02 23:25:16

11ant

2018-11-21 19:13:27
  • #1
I pinged the robber today that he was being missed here, and in the meantime received a private reply. Accordingly, I only want to quote his closing words: The main point is that the series of defects does not stop; now, among other things, the connection points between the general contractor and self-assigned trades are, I’d say, "problematically tolerant" :-(
 

Wickie

2018-11-21 19:24:40
  • #2
Oh dear
Hopefully he will eventually reach the point where he sits contentedly on his sofa, looking out into the garden and can think: It was worth it after all, all the crap
 

kaho674

2018-11-21 19:28:10
  • #3
To be honest, I am glad that he is healthy and well. I had real concerns.
 

chand1986

2018-11-21 19:28:24
  • #4
Then he should really conserve his strength as much as possible and also save here for now. And then hopefully everything will turn out well in the end. If he is reading along: Best wishes from me as well.
 

haydee

2018-11-21 19:54:37
  • #5
Oh dear
I had hoped it would get better as it moves towards self-awarding away from the GU

All the best
Räuber, keep your chin up

Hopefully you can enjoy your house and garden next year
 

Traumfaenger

2018-11-21 23:03:08
  • #6
I also informed the "Räuber" today that he is missed here. He had visited us at the construction site and I also visited him at his construction site. First of all and contrary to some speculations here, he is a clever guy and also very pleasant as a person. This shows how the anonymity of the internet in forums sometimes leads to putting people in the wrong category.

He appreciated the sympathy here, especially since things are going really badly for him at the construction site right now. And the problem is not the subcontractors, but the preparatory work of the general contractor on which the subcontractors are supposed/must build. They sometimes refuse to work because they would make themselves liable (e.g. a totally crooked concrete staircase with very uneven step heights, crooked walls, etc.). We already had a lot of trouble with our construction, but compared to the Räuber, that's all minor. You can really feel sorry for him, a lot is really going wrong and experts and lawyers are making good money from it. At the same time, he is currently facing strong professional demands, but he doesn't lose courage.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
27.04.2020Cat-proof garden16
02.09.2015How large should a garden be at minimum?11
12.04.2016Heat pump: better inside the house or in the garden?38
08.11.2017Looking for a suitable tree for the garden11
10.05.2018Setting up a garden of approximately 600 sqm - rough cost estimate?33
02.04.2018How to secure a slope and design a garden entrance cost-effectively?27
28.03.2018Separate water meter for garden to save on wastewater charges?24
27.04.2018City villa 190m² with driveway & garden on the south side30
13.09.2018Garden landscaping disaster or does it really have to be this expensive?30
02.10.2018Garden landscaper offer ok or rather totally exaggerated?103
03.10.2018Determining flooring for roof terrace: landscape gardener or roofer?10
11.10.2018Waste on the construction site - What is tolerable?138
30.11.2018Noise protection options against railway tracks in the garden14
29.11.2018Ideas for outdoor areas, garden, garden landscaping - suggestions, tips?51
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
19.08.2021House building - an eternal construction site?33
03.05.2022Which garden landscaper to choose? Added value?17
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben