I meant that I want to estimate the costs. The cleaning crew managed the whole thing in one day. I have now received €350 net as a flat rate for both sides. Is that okay?
 

xMisterDx

2022-09-06 21:18:15
  • #2
I don't understand. 350 EUR flat rate for what? Is another company supposed to finish this? Did the cleaning crew manage everything in 1 day? What time?

They no longer have all their tools on site. The mixer has to be brought back, set up, plastered, taken down, cleaned up. I think 1 day for 2 men per side is realistic.
 

Zubi123

2022-09-06 21:46:46
  • #3


The price is good! Our plasterer charges a flat rate of €250 per side when he has to work on a window or door.
 

Neubau2022

2022-09-07 05:31:39
  • #4


OK. Thanks for the information.



The general contractor did not inform us that the exterior door would be installed along with the windows. Since this is our first build, we had the doors installed externally at a later date. The plastering was then only done shortly before the door (front). At the back, the wall was left out. About 3 weeks ago they came and plastered the rest. I assumed the company would cover at least 50%, since we weren’t informed. But apparently not...
 

Neubau2022

2022-09-08 20:28:35
  • #5
Small update.

Today the driveway was inspected and the fencing/masonry. Prices in case anyone is interested:

- Driveway 4m wide €4,800.
- Fencing/Walls: €7,500

Terrace (50 sqm, would be somewhat larger) + earthworks (800 sqm would be dug once). Price approx. €9,600. The terrace will still be repaired. 2 stones are loose.

On Monday the interior doors will be installed and the holes for the LED spotlights finished. The ventilation system is also supposed to be installed.

The painter has been working for a few days and is filling + polishing Q3 quality, then painter's fleece and painting. At the end the matching baseboards for the doors will be installed.
 

xMisterDx

2022-09-08 20:53:57
  • #6
Why should the company voluntarily cover 50% or more of the costs?
 

Similar topics
20.02.2015Interior doors not according to standard18
11.03.2015Planning optimal arrangement of house, garage, and driveway13
20.07.2015Have a terrace built11
13.05.2016Flush or ceiling-height interior doors14
23.07.2016Construction of the driveway with gravel, crushed stone, and paving18
30.09.2021Sound insulation - differences in interior doors?40
10.04.2021Internal Doors Picture Thread - Show your internal door pictures!102
28.11.2018Pave a 100m² driveway49
25.03.2018Interior doors - Included by the general contractor are CPL interior doors15
17.12.2018What is the size of the interior doors? 90 or 100 cm / 211 cm?36
08.05.2018What kind of enclosure is allowed? Is a bamboo hedge also permitted?48
04.02.2019CPL interior doors - edge finishing with edge banding, top side of the door panel16
22.01.2019Are measures necessary for interior doors due to controlled residential ventilation?12
27.06.2019Narrow plot and fencing - assistance13
12.11.2020Craftsman invoice for replacement of defective tool27
16.09.2024Building a terrace from formwork stones27
26.11.2021Interior doors - What types are there? Advantages / disadvantages?48
29.04.2022Are our interior doors sufficient?13
11.10.2023Small plot, small driveway - space needed to turn around43

Oben