Construction of a 144 sqm bungalow in Fichtenwalde (near Potsdam)

  • Erstellt am 2021-05-16 18:56:12

TmMike_2

2021-11-17 16:29:59
  • #1

No, 9-10k for water connection is unfortunately normal. It's an absolute outrage but there's nothing you can do about it.
 

DennisW

2021-11-17 19:20:50
  • #2
Hm, then we were lucky.
Potsdam: 3 meters from the street = 6400 euros
 

TmMike_2

2021-11-17 19:23:10
  • #3
I paid about 28k in total for 24 linear meters of street (paving) and other development costs (gas, water, sewage, electricity, fiber optic). It's really expensive.
 

Tom1978

2021-11-18 10:12:11
  • #4
It continues: rough staking out (moreWords).
 

Nida35a

2021-11-18 10:21:55
  • #5
quite crooked measurements, the much-praised octameters I do not see at all, why didn't you measure the width of 20.00m from the forest, or is that tolerance?
 

Tom1978

2021-11-18 10:25:37
  • #6
The 16.28m is the prescribed building limit. We wanted to fully utilize it so that the distance to the street is as large as possible. After subtracting the house, we still have a garden of about 42m x 20m. Boundary distances are 3m each. On the right side, there is already a building, so we wanted a slightly larger distance there. On the left side, there is a forest.
 