Thank you for the info - That sounds good, then you also need to worry less about airtightness, the foil will then be glued to the plaster on the side. So studwork with substructure. That is good for ventilation system and cables and everything you don't want to see for lighting etc.The ceiling will be made with drywall. 11 cm thick drywall, the panels will be laid on top. The external construction supervisor said to pay attention to ventilation. The attic was not done beforehand, so that no mold develops (that was the information).
The attic is only intended for storage, no rooms will be created there.