Construction of a 144 sqm bungalow in Fichtenwalde (near Potsdam)

  • Erstellt am 2021-05-16 18:56:12

Tolentino

2021-12-02 09:27:56
  • #1
There are things he must do and things he can do. At the same time, there are things you can do as well. I would always pull out all the stops that contribute to success, even if it seems redundant. Especially if they cost me very little.
 

Tom1978

2021-12-02 11:55:43
  • #2
Freshly taken photos. Not yet 100% finished. The construction supervisor will come later as there are other appointments scheduled. However, everything is documented. Photos of the final result before pouring will also come from the managing director. The company creates a construction diary after each trade.

If the weather cooperates in the new year, bricklaying will begin on 10.01.


 

Nida35a

2021-12-02 12:43:22
  • #3
The stones are on pallets and protected with foil from the factory. The manufacturer does not know whether they will be used immediately or will remain in the yard for another year. Each pallet has a manufacturing date and an earliest processing date on it. We had photographed every label, and we almost never needed the pictures. Also the pictures of the labels of insulation, buckets, tar paper, adhesives, simply everything.
 

Tom1978

2021-12-02 12:44:55
  • #4


I discussed the matter with the shell builder and the managing director of the BU. He said that nothing needs to be done because they are already protected. A construction fence will be put up for insurance reasons and that will be it.
 

11ant

2021-12-02 14:10:07
  • #5
Don't forget the most important photo subject: the foundation earth electrode :)
 

Tom1978

2021-12-02 17:05:46
  • #6


More photos for you :-) According to the construction supervisor; it is a married couple (man: civil engineer, woman: architect); everything has been excellent.









 