Construction of a 144 sqm bungalow in Fichtenwalde (near Potsdam)

  • Erstellt am 2021-05-16 18:56:12

Neubau2022

2022-05-03 15:17:17
  • #1


Yes, there will be tiles on the floor. Drying is not a problem. I can go over several times a day from work.
 

Neubau2022

2022-05-03 16:12:45
  • #2


According to the heating technician, the exhaust and supply air is done via the ceiling. Everything super :cool:
 

Neubau2022

2022-05-04 09:14:44
  • #3
The move-in date in July can probably be almost forgotten :-(

Delivery problems with:

- Controlled residential ventilation (probably because of the enthalpy heat exchanger)
- Brine water heat pump (I am still gathering information on this)
- Meter cabinets (currently very, very difficult to get. Delivery date is probably in 10-12 weeks...)

We remain curious. If we want to cancel by 31.08., we have to do it by the end of the month. We will wait until 25.05. to cancel, maybe more will be known by then.
 

Mahri23

2022-05-04 09:22:38
  • #4
I would "possibly" leave/plan one or two more months of leeway before terminating the apartment. So rather aim for the end of Sep./Oct. Don’t make it too tight. You’ll be annoyed if something still goes wrong. I would talk to the landlord that if you do move in sooner, you will vacate the shared apartment more quickly.
 

Neubau2022

2022-05-04 09:35:41
  • #5


We won’t get that through. We have a three-month notice period to the end of the month.
 

Benutzer 1001

2022-05-04 09:35:56
  • #6
Please decouple the heat pump from the screed and do not place it on top. If it runs 24/7, you might have a constant humming in the screed.
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
08.05.2014Most moisture from screed?25
10.05.2015Screed uneven - defect removal refused52
10.08.2015In which season of the year is it best to bring screed into the basement10
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.08.2016Upper floor without screed - only concrete floor15
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
31.07.2016Screed does not extend into the reveals at windows / terrace doors on the ground floor12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
05.04.2017Super disaster - water pipe burst, screed damp31
09.04.2017Screed is too low. Are there standards for this?16
30.04.2017Screed applied too high - room height consequently lower11
05.08.2017Screed necessary? Unfinished but insulated attic23
19.08.2017Technical room before installing screed: should the technology be painted now or later?16

Oben