The kitchen is installed (except for one cabinet that was missing). The scratches on the floor are hard to spot with the naked eye. We showed them to the flooring installer, he will fill them again. I told him to show me how to do it right away; these won't be the last scratches. =)
And the shower in the shower-toilet downstairs is currently being tiled. I am thrilled and relieved. This is the moment when the 3D plans and sketches are transferred into the real house. Now that everything is coming together, it is really beautiful and exactly as we had hoped.
I also have some great photos of the entrance area upstairs and of the beautiful pre-wall in the shower-toilet (I'm curious how this will be received here in the forum). But I prefer to post them when everything is finished. =D