Hanging house in the Southwest Palatinate - Our House Construction 2.0

  • Erstellt am 2022-09-09 18:13:24

kati1337

2023-07-21 10:05:46
  • #1
Ermahgerd - I already love it. I was so unsure about the floor because we basically only had the choice "that one or vinyl - everything else is more expensive." And we just said after looking at 3 floorboards "yep, we'll take it." Seeing it laid out for the first time now - wow. :eek:
 

kati1337

2023-07-23 11:37:33
  • #2
Yesterday was the 4th appointment at the house with the broadband provider.

Appointment 1: no one showed up, call: technician is delayed, asking if we could come back 3 hours later.
Appointment 2: 3 hours later: waited 1.5 hours with baby at the construction site. No one comes, no one reachable by phone anymore (after 7 pm). Googled, called the boss's number from the imprint - he sorted it out. Turned out the technician had a breakdown and was waiting for ADAC. He wanted to call us earlier but had no contact details and the office was already unstaffed.
Appointment 3: technicians arrived on time. Tried to blow cables through, had no air. Turned out: the empty conduit is indeed in the utility room, but on the other side it was not connected from the curb to the distribution box. o_O They said this needed to be clarified and that they would call us back.
And unexpectedly - they actually called us on Friday - to ask if we could come to the construction site Saturday for the technician.
Appointment 4: we arrive at the agreed time at the construction site - our floor layer informs us: technicians had already been there, wanted to "do something but it didn't work because they had no air - left again". At that point I was slowly boiling.
Called the "boss from the imprint" again - this time it was someone else who asked me where I got the number, he was not responsible. I said we had an appointment with them, standing at the construction site and no one showed up. He said he would sort it out. Prompt callback from the technician (by the way the same one from appointment 3): "We were already there!" - Me: "Yes, but we weren’t?? We are HERE NOW, at the time we were told." - "Oh, sorry ... yes we were there, but we had no air, the civil engineer has to come back." Me: "So the same problem as last week?" ... "Hmm, yes kind of. Can you do Monday? We'll come again Monday." - Me: "What time on Monday? And won’t we have the same problem again on Monday as last week and today?" - "No no, on Monday we have the civil engineer with us. We'll schedule the appointment, I don't know the time yet - I will call you."

So it remains exciting. o_O

Honestly, if I worked like this I would have been fired a long time ago. :D
 

WilderSueden

2023-07-23 14:41:05
  • #3
I was told something similar. When I called around 1 p.m. to ask if they knew the appointment time, I got a "In our system it says 12-2 p.m., the client is on site." The paramedics/heating technicians were then let in.
 

kati1337

2023-07-23 14:42:18
  • #4
I don't care anymore, as long as the cable is laid. :rolleyes:
 

Holzhäuschen

2023-07-24 12:01:47
  • #5
I signed up especially to virtually stop by your [Haus] :)

I'm very happy that everything is going so well and sorry for the two weeks delay. Especially when you struggle for so long to FINALLY be able to move, two weeks is a long time.

I definitely wish you all the best for the final sprint!
 

kati1337

2023-07-24 22:41:20
  • #6




It's moving forward. I have to post the beautiful parquet floor again. I think it looks wonderfully natural, considering it's rather inexpensive.

There was a bit of chaos in a few spots. :D When I came in on Saturday, the floor installer was just laying parquet in the utility room. I said that tiles were actually supposed to go there. I mean, it does look nice. :D When he asked "Is that a problem?" I was only thinking about the moisture, but we have exhaust ventilation in that room, so I hope it won't cause any issues.
We also hang laundry there, but rarely soaking wet. I hope the floor can handle it.
And during the process, we also overlooked that it uses a lot of square meters that weren't planned. Well, when I saw it, it was pretty much too late; the floor is glued down.

It'll work out somehow.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
16.07.2015Cable for outdoor lamp too short11
01.01.2016Cost of house connection for Kabel Deutschland and Telekom?37
14.01.2018Kabel Deutschland or Telekom or both14
19.02.2018UPT cable - What is it and where to install?10
11.10.2018Waste on the construction site - What is tolerable?138
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
06.06.2020Pull the cable through the conduit20
08.04.2021Building without antenna and SAT-CAT cable without conduit?65
17.09.2020House connection pillar in the garden vs. house connection directly in the utility room35
01.09.2020Which conduit for LAN cable?32
18.09.2020CAT cable in the utility room - not crimped?45
14.04.2021Planning HAR/Utility Room - Technical plans unknown12
08.05.2021Connecting LED ceiling lamp - several cables hanging from the ceiling27
19.08.2021House building - an eternal construction site?33
21.02.2022Electric gate, bell and opener, and only one cable33
29.10.2022Is the property fully developed? - Cable is partially missing10
28.11.2022Do you need LAN cables in the garage?107
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13