Hanging house in the Southwest Palatinate - Our House Construction 2.0

  • Erstellt am 2022-09-09 18:13:24

kati1337

2022-10-21 11:51:48
  • #1




It's making progress. The ceiling has been concreted, now the second floor is being built. I'm very curious how it will turn out.
I'm always a bit shocked at how huge the house looks. Also because of the massive garage next to it. And the neighboring plots are quite narrow and long, so the houses are planned accordingly more lengthwise on them. And we placed ours crosswise on the plot, so it currently looks a bit oversized. It will definitely look better once the roof is on. :)


The kitchen is also ordered; this is the one we chose.
Nobilia Sylt in Magnolia. The countertop will be an Oak Sierra, and the sink made by Villeroy & Boch "ivory" (the top sink in the photo).
 

kbt09

2022-10-21 12:21:29
  • #2
... with the 90-60-90 solution ;) .... plus extra characters
 

kati1337

2022-10-21 12:26:59
  • #3


Yes exactly :D The idea came up in KF, and in the end it also convinced visually. ^.^ We have planned the waste separation not in the sink cabinet but now at the bottom in the 90 cm unit in the corner. More fits in there, and it’s also closer to the coffee machine.
 

kbt09

2022-10-21 16:34:46
  • #4
... just ask why I knew 90-60-90 ;) ... all a question of identity ;)
 

kati1337

2022-10-21 16:36:56
  • #5
I almost suspected that. hehe ... :D Totally secret whispering here
 

WilderSueden

2022-10-21 16:46:44
  • #6
It's not that secret. Even I as a man can decipher it ;)
 

Similar topics
23.12.2015Villeroy & Boch O-Novo including WC seat experiences13
06.11.2017Villeroy & Boch Combipool Invisible26
07.06.2022Which wall toilet: Villeroy & Boch, Geberit, Duravit???39

Oben