Construction progress: Duplex with WU basement and developed attic

  • Erstellt am 2021-01-04 14:44:59

Hausbau0815

2021-04-03 14:52:13
  • #1


: Please write again about what you mean here. What is this blame nonsense supposed to be? I have a general contractor, whoever is commissioned by him for the scaffolding is their business! And even if it’s the biggest idiot for whom spelling is apparently a foreign word. I have neither an offer from the scaffolder nor any other contractual relationship with him. So please don’t post any blanket blame crap here if you don’t know the connections.
 

11ant

2021-04-03 15:15:25
  • #2
Owning property is sometimes more blissful than knowing that it is actually spelled without an "h." I like working with dyslexics: secondly, they are often more focused when sorting out the details than the nerds who get distracted by spelling, and first of all, "dyscalculia with letters" is harmless in bookkeeping matters. And that's what matters to the businessman considerably more.
 

schubert79

2021-04-03 15:42:12
  • #3


He probably means the note on the scaffolding. It is written in terrible German and style.
 

Hausbau0815

2021-04-03 15:42:19
  • #4
So I now always address the scaffold personally, since I now know that its name is Willi. I've also thought about making a song out of it with the title: "I'll build you a scaffold that bears your name". But until then, I tell everyone that no one is allowed to go on it anymore.
 

Hausbau0815

2021-04-03 15:49:39
  • #5


That may be, but what "shared guilt" do I have if someone is not proficient in German spelling and expression? In my opinion, one should be very cautious with accusations if one has no understanding of the context. And here I am exactly at the point where I have stopped this as well as the previous thread on the same topic several times, because I am extremely allergic to such stupid, incoherent claims.
 

Hausbau0815

2021-04-03 18:39:51
  • #6
Back to the topic: So after changing lawyers and the new expert report not taking place, but with more and more visible defects, the new lawyer came to the construction site a week ago with a friendly architect to get an idea. It ended with the words that his client was too stupid to walk and that the matter was undisputed. The architect took note again of all the defects found so far, including those already mentioned in the expert report, and promised a renovation concept with a cost estimate for Monday. This then arrived and blew me away. Just the defects contained in the TÜV report had already been estimated at €100,000. In this one, the defect repair costs had just shrunk down and were listed at a total of just under €42,000!!!!! And the friendly opposing lawyer even added that they agreed that this could also be done for a maximum of €35,000. If only I had met those two earlier, they would have built the entire semi-detached house for less than half the price. They must have such cheap companies on hand, you could even get a discount. I then spoke on the phone for 2 hours on Tuesday with my lawyer, who unfortunately could not come to the construction site appointment due to quarantine, and we ripped the whole thing apart. Unfortunately, the Dipl.-Ing. made massive mistakes in quantities and prices. He stated the interior walls at 15 m² for 600 m² of living and usable space, the drywall at 150 m² simply instead of 380 m² double layered, the roof at 200 instead of 320 m², the craftsman hour at €38 gross. The removal of screed in all 4 bathrooms, reduction of insulation, change of underfloor heating and relaying of screed again he stated in total at €1,300 and completely left out the window replacement. And for that, he still gets a whole bunch of money. Disgusting!
 

Similar topics
04.07.2015House contract with financing condition, lawyer wanted10
16.05.2016Scaffold closed - does this have consequences?11
08.06.2016Decision on land purchase, geological report, pressure with purchase contract / review20
10.08.2018Landscaping company - defects, high bill, no warranty?!13
18.10.2018Liability for various defects after acceptance of the property19
21.05.2019Balcony door and window sills - defects in new construction28
21.07.2020Lawyer wanted to sue the construction company52
11.04.2020Construction law - hire a lawyer or not yet16
04.01.2023Retaining wall 2 m high without static report?10
04.09.2020Handling standard land values/reports conversion17
15.12.2020Has the professional association blocked the scaffold during self-performance?23
21.01.2021Exterior plaster is uneven, window sills are too short, tightness of the ETICS (External Thermal Insulation Composite System)63
09.03.2021Withholding payment for defects in the shell construction74
24.12.2021GU insolvency after acceptance - Open defects15
10.08.2022Hydrogeological Report - Geothermal Energy, Air-Water Heat Pump or Ice Storage?26
03.10.2022Building acceptance of new construction despite missing heat pump. Significant defects?50
06.04.2023Deficiencies in the new construction. Dispute over the amount of withholdings.35
19.04.2024Bank withdraws financing commitment due to defects20
28.06.2024Building permit - is a lawyer useful?12

Oben