Construction progress: Duplex with WU basement and developed attic

  • Erstellt am 2021-01-04 14:44:59

TmMike_2

2021-12-03 23:45:45
  • #1
I am happy for you. Respect that you pulled it through, how many would have failed? All in all, better an end with horror than a horror without end, right?!
 

Hausbau0815

2021-12-03 23:47:11
  • #2
as can be seen here. In addition, there are towel holders, a toilet paper holder, a spare toilet paper roll holder, and a toilet brush holder with brush (the brush alone costs €69) per bathroom, so times 5. We didn't want any of this, but the general contractor ordered it. :)
 

Hausbau0815

2021-12-03 23:50:37
  • #3
We're not quite at the very end yet, well, I am at the moment, but from cleaning ;). Now it goes on with house 2, but I will manage that too.
 

TmMike_2

2021-12-04 00:03:40
  • #4
I believe you.
I was so exhausted at the end of the house construction that I had window cleaning and other things done. My wife wanted to get in because of the child (4 weeks before delivery).
I then preferred to do the final sanitary installation and had cleaning done in parallel.
I simply couldn’t clone myself and my wife could no longer climb the ladder (3m ceiling height).
 

guckuck2

2021-12-04 01:45:15
  • #5
This is really a story for life. Even in the latest pictures, there are things to be seen where you think - yeah, you can want that, but you don't have to. By that, I especially mean the electrical parts. But well, you have had interesting resistors and I thank you for the persistent presentation.

I also hope for financial justification and peace of mind.

As is well known, hope dies last. All the best.
 

Hausbau0815

2021-12-04 06:13:28
  • #6


You probably mean the kettle?
 