Construction progress: Duplex with WU basement and developed attic

  • Erstellt am 2021-01-04 14:44:59

WilhelmRo

2022-05-04 10:57:04
  • #1
I can only ever be amazed by things like that.

With us, every trade was only awarded to regionally known contractors – there are plenty that you know. You recognize their advertising signs from every newly opened construction area in the region.

And if I were to get the idea to hire a completely unknown one, I would inform myself very well in advance...

Therefore, I can only ever laugh when I see the typical reports on YT or ZDF.
 

AllThumbs

2022-05-04 11:06:03
  • #2

With something like this, I can only ever wonder how someone can assume that everyone builds in the immediate vicinity of their hometown and knows 100% about the local craftsmen.
People, really...
 

WilhelmRo

2022-05-04 11:19:25
  • #3
I am building once in my life. I inform myself at most about the general contractor. No matter where he is.
 

x0rzx0rz

2022-05-04 12:52:52
  • #4
Congratulations! I hope there will be time to relax soon.
 

Hausbau0815

2022-05-04 12:53:45
  • #5
I don’t know in which construction phase you are right now, but I can only hope for you that your laughter doesn’t fade. Because 1. things famously turn out differently than 2. you think. Acquaintances hired the locally best-known and most expensive company, and they messed up the order five times. By the way, I’m not building for the first time, but for the second. The first time everything went smoothly, the second time almost everything went wrong. And I wouldn’t rely on advertising signs for a long time anymore. A good company doesn’t need them. But in the end, you’re always wiser.
 

Tolentino

2022-05-04 13:03:10
  • #6
As I see it, you have to marry into a good craftsman family and then do as much as possible yourself. Kit house!
Could actually be worth it. 2 years sabbatical might cost you 200k EUR, 50k EUR kit, another 200k EUR interior finishing, 50k EUR exterior facilities, 50k EUR incidental costs, 50k EUR helper wages. That’s also 600k EUR, but you don’t necessarily have to pay yourself a full salary and craftsmen are getting more and more expensive.
Of course, it’s all useless if there are no more materials.
 