In our conversation, the house with 140sqm without a basement is roughly estimated as follows:
[*]Solid house - fully brick-clad = 255k
[*]Plot fully secured with L-blocks approx. 100m, installation, material = 20k
[*]Paving work = 10k
[*]Masonry double garage incl. foundation etc. = 40k
We will receive the exact and detailed offer shortly.
What do you think of the "rough" estimate? The scope of construction services should be very similar to that of the other contractor, as they come from the same area and know each other's scopes of work. Advantage?