Bafa funding for heat pumps will be discontinued as of 31.12.2020.

  • Erstellt am 2020-12-06 12:14:12

Mateo84

2020-12-12 18:38:14
  • #1
Isn't the annual performance factor calculation the only document that must be uploaded during the application? I think I saw that this document can be created on another site by providing the pump. On this site, the installer must sign?
 

Tolentino

2020-12-12 18:41:03
  • #2
Only when the subcontractor has been commissioned is it too late. So a contract with the main contractor is not a problem. yes, the annual performance factor proof is the most important. However, an offer should still be available. So far, there is no known case here where the offer was requested afterwards, but the BAFA reserves the right to do so. So better to have an offer with the corresponding content in it... the one where the heating technician has to sign comes after the execution of the work. That is a form and is called Fachunternehmererklärung
 

Mateo84

2020-12-12 19:05:08
  • #3
I just checked the form again. It states that with this application a separate calculation of the annual performance factor or JHZ is included.

At the latest when you select [flächenzeizung] and electric at the bottom, a field for the annual performance factor according to VDI appears. These are all mandatory fields... but this annual performance factor is again dependent on the supply/return temperature! There is a special form that calculates this.

Now I'm wondering how you applied for it?
 

hausnrplus25

2020-12-12 19:06:30
  • #4


You can now hear a really loud stone falling from your heart out of relief ;)
We did not count on the Bafa funding at all in the financing etc., but if it works out, we won’t say no and will have more money for our outdoor area.

The email to the general contractor goes out right away :D
 

Isokrates

2020-12-12 20:56:50
  • #5
There is a computer from the bwp that meets the required conditions (VDI). The result of the computer was uploaded with my application.
 

Mateo84

2020-12-12 21:02:40
  • #6
Exactly the one I mean, but it has to be signed by heizi, right? At least it says bottom right, stamp and signature. Who filled this out for you? Are only the supply/return temperatures relevant for the invoice?
 

Similar topics
15.06.2016Bafa: Renewable Energy Heat Pumps with Test Certification32
07.10.2016BAFA funding tips38
23.09.2017Bafa innovation funding for heat pump possibly too late - what now?15
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
10.04.2019LWZ 504 with or without buffer tank14
12.04.2019BAFA innovation funding air heat pump43
19.07.2019Subsidies: how effective? And sensible when using own funds?23
15.02.2020KFW55 funding + BAFA funding57
20.01.2020New BAFA funding - Air-to-water heat pump with solar thermal39
24.01.2020Annual performance factor calculation for funding (parameters and calculation tool)29
09.02.2020BAFA - Funding: House contract before application submission?10
01.12.2020Eligible costs for heat pump134
27.03.2020When does BAFA pay out the funding (air-water heat pump in new construction)?10
03.06.2020KfW 55 + BAFA Funding - Costs and Subsidies24
24.05.2020Heat pump and BAFA - What is true and what is not?24
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
20.04.2021BAFA funding depends on the form "Confirmation of the Developer"20
17.12.2024BAFA funding - experiences with payout duration?52
01.08.2023BAFA Funding - What Waiting Time Is Realistic?27

Oben