Neubau2022
2022-10-03 09:38:07
- #1
At our place, the heating and [Kontrollierte-Wohnraumlüftung] will be inspected and switched on by Bosch on 13.10. We can submit the documents until the end of January 2023. The [GU] will then fill out everything and include the [Kontrollierte-Wohnraumlüftung], brine-water heat pump, as well as the passive cooling.