haydee

2018-10-02 15:25:50
  • #1
In addition to the summer cassette The summer cassette automatically turns the ventilation off and on in summer. Off when the outside air temperature is higher than the inside air temperature and on when the outside air temperature is at most the inside air temperature
 

Roppo

2018-10-02 18:25:53
  • #2
Ah ok and will the summer cassette be integrated into the "cabinet"? Can I do that myself? How much does it cost approximately?

Regards
 

Roppo

2018-10-02 18:47:07
  • #3
PS: and on the topic of funding. I have read several times that people did not receive the BAFA funding even though the application was submitted on time. In these cases, it apparently failed due to the annual performance factor. So what must the heat pump look like to ensure I definitely get the funding?
 

haydee

2018-10-02 20:17:49
  • #4
Yes, you can change it yourself. It's not difficult and doesn't take long. On YouTube you can find videos. I mean, it was explained on the 304. No idea what they cost individually. It was included with us.
 

Roppo

2018-10-03 12:00:36
  • #5
Can no one help me with the annual performance factor? So can I just specify something standard, is there a fixed subsidy for the 504 regardless of installation conditions? Or do I have to calculate and prove something...?

In the online application of Bafa, it already says that air-to-water heat pumps are not eligible for funding - which probably applies to most. But obviously many have already received funding for the LWZ 504.

I don't really know how to approach this...
 

Kekse

2018-10-04 13:57:59
  • #6
Where does it say that? I only read that air-air heat pumps are not eligible for funding.
 

Similar topics
15.06.2016Bafa: Renewable Energy Heat Pumps with Test Certification32
07.10.2016BAFA funding tips38
23.09.2017Bafa innovation funding for heat pump possibly too late - what now?15
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
22.02.2018Air-water heat pump, water-based pellet stove, and photovoltaic system17
12.04.2019BAFA innovation funding air heat pump43
22.11.2019Feedback on heat pump / offer requested!46
15.02.2020KFW55 funding + BAFA funding57
20.01.2020New BAFA funding - Air-to-water heat pump with solar thermal39
24.01.2020Annual performance factor calculation for funding (parameters and calculation tool)29
09.02.2020BAFA - Funding: House contract before application submission?10
01.12.2020Eligible costs for heat pump134
03.06.2020KfW 55 + BAFA Funding - Costs and Subsidies24
24.05.2020Heat pump and BAFA - What is true and what is not?24
14.10.2022Air-to-water heat pump sizing in new construction311
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
14.02.2024Bafa funding for heat pumps will be discontinued as of 31.12.2020.510
20.04.2021BAFA funding depends on the form "Confirmation of the Developer"20
03.01.2022Electricity meter for heat pump in combination with BAFA and photovoltaic22
30.06.2023Cancellation of an already confirmed Bafa funding15

Oben