You can extend once by 12 months, "if necessary." Surely there will always be some way to justify that. Everyone believes delays in construction (and it's usually not even fabricated). You have 6 months after the approval period expires to upload the proof of use. However, I think the measure itself must still have been implemented within the - possibly extended - approval period.
 

Mateo84

2021-04-27 09:26:08
  • #2
I also think it just makes me nervous, since the stuff is expiring and they adjust their extensions, I would expect anything. The ch also has to have the heating running until 11.2.2022 ... Construction start is 1.7/8.2021 so it's also a tight thing ...
 

DaSch17

2021-04-27 09:54:32
  • #3


I think you are a bit mixed up right now.

KfW 153 until 30.06. (old): 120,000 EUR loan minus 25% repayment grant; the loan must be taken.

KfW 261 from 01.07 (new): 150,000 EUR loan minus 25% repayment grant; the loan must be taken.
or
KfW 461 from 01.07 (new): Only a grant of up to 37,500 EUR is granted. Taking out a loan is therefore not required.

What exactly is required now for a KfW 40 Plus EEH to meet the requirements of the EE- or NH-package is not yet clear in detail. Currently, however, it can be assumed that when building a single-family house with timber frame/wood frame construction, the requirements of the NH package are met and thus 37,500 EUR is granted.
 

Mateo84

2021-04-27 10:12:42
  • #4
Okay, so 153 is being replaced, now I wonder if I can claim the full amount with my massive building according to KfW 40 plus or not, and no one can answer me -.-
 

DaSch17

2021-04-27 11:10:27
  • #5
The leaflet to be published will be able to tell you that. However, your solid construction certainly cannot score points when it comes to sustainability :D
 

Mateo84

2021-04-27 12:01:48
  • #6
I think so too, exactly what the good people understand as "sustainable" ;P
the information sheet will probably come too late... well... then so be it, one shouldn't complain anyway...
 

Similar topics
30.05.2012Massive house costs KFW 70 - Prefabricated house65
01.06.2014KfW funding measures started late13
13.02.2015KfW Energy Efficient Building11
07.04.2016New KfW conditions from 04/201674
08.02.2016Cancel the loan and accept a better offer?37
10.05.2016KfW funding for two-family house26
26.07.2016Calculation of equity capital in connection with KfW loan28
30.11.2016Only one credit component or several credit parts?19
06.02.2017Upgrade from KfW 55 to KfW 40+16
11.02.2017KfW loan in 2017 for a house under the 2016 Energy Saving Ordinance17
01.05.2021KfW loan + repayment grant for granny flat39
16.04.2020Is the KfW loan still salvageable / changeable?10
18.11.2021KfW funding for KfW 40 Plus houses from now and from 01.07.202157
17.04.2021New KfW Building Loan Conditions17
06.07.2021KfW loan is expected to become cheaper from 01.07.58
14.06.2022KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 4641239
29.01.2023KFW Credit 261: New Construction Efficiency House 40 NH17
11.03.2024Repayment grant KFW 261 - experiences?11

Oben