BAFA funding tips

  • Erstellt am 2016-05-24 20:01:39

oleda222

2016-05-30 13:43:15
  • #1
Produced heat in kWh per year / electricity consumption of the heat pump per year = annual performance factor

The annual performance factor can therefore only be calculated accurately retrospectively and depends on the temperature profile/location and individual heating behavior.

Annual performance factor according to VDI etc. or similar is an assumption to simulate the annual performance factor under certain conditions...
 

Sebastian79

2016-05-30 13:46:56
  • #2


And only the calculation according to VDI is sufficient...
 

MarcWen

2016-05-30 16:28:51
  • #3
Is there even an LW WP that is funded by the BAFA? I find the list confusing as well.
 

world-e

2016-05-30 16:48:49
  • #4
Yes, it already exists. At least theoretically. However, it is very difficult to achieve an annual performance factor of 4.5. For existing subsidy programs, an annual performance factor of 3.5 is sufficient. That is why BAFA states that air-to-water heat pumps are mainly subsidized in existing buildings.
 

MarcWen

2016-05-30 17:31:48
  • #5


Then they should replace "predominantly" with "only." We are currently planning our new building with an air-water heat pump and had the BAFA subsidy in mind. But as it looks, you can forget about that.
 

Andre8999

2016-05-30 17:44:28
  • #6
We are planning to install an air-water heat pump in our new building. We want to install the Buderus WPL8 AR. According to Bafa, it is eligible for funding. Our heating installer supported the application and carried out the annual performance factor calculation. We arrived at 4.57, and thus the heat pump is eligible for funding (at least according to the guidelines published on the internet). I have not yet received an approval, only an acknowledgment of receipt with the note that we can now place the order for the heating installation.
 

Similar topics
06.12.2015Heat pump / final energy demand / annual performance factor20
15.06.2016Bafa: Renewable Energy Heat Pumps with Test Certification32
19.05.2016Gas or heat pump in a KfW55 house31
23.09.2017Bafa innovation funding for heat pump possibly too late - what now?15
30.09.2018BAFA funding for air-water heat pumps in new construction - how does it work?30
22.02.2018Air-water heat pump and water-driven pellet stove and photovoltaic system17
12.04.2019BAFA innovation funding air heat pump43
22.11.2019Feedback on heat pump / offer requested!46
07.05.2020Collaboration of air-water heat pump, photovoltaic system, and storage38
15.02.2020KFW55 funding + BAFA funding57
20.01.2020New BAFA funding - Air-to-water heat pump with solar thermal39
24.01.2020Annual performance factor calculation for funding (parameters and calculation tool)29
09.02.2020BAFA - Funding: House contract before application submission?10
01.12.2020Eligible costs for heat pump134
24.05.2020Heat pump and BAFA - What is true and what is not?24
14.10.2022Air-to-water heat pump sizing in new construction311
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
14.02.2024Bafa funding for heat pumps will be discontinued as of 31.12.2020.508
03.01.2022Electricity meter for heat pump in combination with BAFA and photovoltaic22

Oben