Construction company halts work despite overpayment

  • Erstellt am 2019-08-11 09:55:26

haydee

2019-11-10 19:11:16
  • #1
Make sure that it is not done slapdash and carelessly
 

dab_dab

2019-11-10 19:12:11
  • #2
03/2020 still doesn't work in my opinion, but I'll keep my fingers crossed for you.

And being quick is certainly positive - time pressure, because otherwise financial damage threatens, can also end in sloppy carelessness with work and materials. So always keep a careful eye on your construction work.
 

Zaba12

2019-11-10 19:12:43
  • #3
As I said, don’t get hung up on that! The subcontractors can only work. We had no downtime and, according to your schedule, would have finished by mid-May.

Our roof arrived at the end of December, and we moved in at the beginning of July.
 

Hausbau2019

2019-11-10 19:25:05
  • #4
Our external site manager is on site daily, sometimes even up to 3 times a day. We have already had forgotten doors, missing steel reinforcements and concrete supports, and the like. We can rely on him. I hope that we can get the house watertight (roof, windows, doors) by the end of the year, that would be great. And then finally dry out the basement and the ground floor, which have now been standing in water for 1 year. After what we had to go through with this construction company, we no longer commit to anything.
 

haydee

2019-11-10 19:36:49
  • #5
Then it's good. The screed also needs to be dry. Until then, not much can really be done.
 

Hausbau2019

2019-11-10 19:45:07
  • #6
The screed is supposed to come at the beginning of February and then a 2-week break or [Außenputz]. Can someone tell me when the kitchen measurement can be done? We have kept postponing it for over 10 months now. But they need 12 weeks from the measurement to delivery. In the end, the house will be finished, but no kitchen there :rolleyes:. Kitchen measurement before or after screed?
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
08.05.2014Most moisture from screed?25
10.05.2015Screed uneven - defect removal refused52
10.08.2015In which season of the year is it best to bring screed into the basement10
29.09.2015Financing model - how to proceed?11
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.08.2016Upper floor without screed - only concrete floor15
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
31.07.2016Screed does not extend into the reveals at windows / terrace doors on the ground floor12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
05.04.2017Super disaster - water pipe burst, screed damp31
11.09.2017Raise the planned click vinyl flooring or increase the screed?12
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
26.02.2022Concrete floor without screed on the upper floor/attic, what to do?24

Oben