Construction company halts work despite overpayment

  • Erstellt am 2019-08-11 09:55:26

tumaa

2020-01-19 13:57:34
  • #1


My seller :) ...was referring to 11ant's comment.
 

koch-tvprodukt

2020-02-06 17:56:59
  • #2
Good evening,

for a well-known TV producer and his new show about construction defects, we are looking for property owners who need support. He will assist you in enforcing your rights, and his experts will be at your side with advice and practical help.

If you are interested, please contact me at robert@koch-tvproduktion.de

We, koch-tvproduktion, develop reports, docu-soaps, documentaries, magazine contributions, and complete formats for all German broadcasters - public and private.
 

Hausbau2019

2020-02-07 06:42:16
  • #3
That sounds quite good for a change. I have already made contact.
 

fach1werk

2020-02-07 10:35:00
  • #4
Hopefully this helps!! I would be happy for you. Sometimes a woman can use a little tailwind.
 

tumaa

2020-02-07 10:53:31
  • #5
please help Hausbau2019 and when you are done with that, come to me, I will show you a botched seller :-).
 

Hausbau2019

2020-02-07 20:57:46
  • #6
Well, a decision will probably be made next week and currently there are several candidates to choose from. But many thanks also for your support. Except for this ray of hope, total frustration has settled in with us. I had commissioned a company with the defect repair, with which I have been in contact for a year because the managing director himself was harmed by our ex-business unit manager and I really believed he would help us. He gave me an offer based on hourly billing and said that he had calculated generously and it would be significantly less (440 working hours and €10,000 material - invoicing based on delivery note). Yes, it already sounded like a lot, but I stupid cow believed in the good again. The scaffolding was also included. Anyway, last week the invoice arrived for 3 working days = €4,605! without materials. Incredible! The attached construction daily reports showed working hours from 7:30/8:00 am to 3:00 pm for 5 employees. But before 10:00 am, no one was on the construction site and after 2:00 pm neither, and on one day they even only arrived at 11:00 am. The times were said to include travel, departure and scaffolding loading time and "biting into the cuts" was explained to me. For 3 hours on the construction site, I am supposed to pay for 7 hours of work for 5 employees???? At an hourly rate of €53.55!!!! Are you serious??? I brought the guys coffee, which I quickly stopped doing again because this coffee break costs me about €50. In 4 days they managed just to set up the scaffolding, cover the windows with foil and paint the basement plinth. Oh, I almost forgot. We still have one construction door now. However, it was installed locked and no one knows where the key is. Cool, right......? We now can only get into our house by having someone climb on the scaffolding, through the window on the upper floor, ladder down again, remove the grid of the terrace door, which is secured from the inside, and then let the others in. Can I finally wake up from this crappy nightmare!
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
27.02.2015Burglary-proof windows?33
03.06.2014Interior design - windows14
16.01.2018Is an extra charge for colored windows realistic?19
18.06.2014Inspector defect identification, determination of window installation10
18.05.2016Help needed with window arrangement!32
27.05.2015Huge problem with condensation on the window34
20.12.2019Trefz window prices and experiences?14
26.01.2015Window between two rooms13
13.03.2015Opinions on window parapet height sought30
28.05.2015Round window - dissatisfied with the interior reveal16
16.05.2016Scaffold closed - does this have consequences?11
10.08.2018Installation of floor-to-ceiling window & French balcony, old building, 4th floor12
11.10.2018Waste on the construction site - What is tolerable?138
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
18.10.2020Window & door installation not compliant with standards28
15.12.2020Has the professional association blocked the scaffold during self-performance?23
19.08.2021House building - an eternal construction site?33
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben