Well, then you have destroyed the family ....
 

Hausbau2019

2019-08-16 22:05:25
  • #2
: Thanks for your sympathy. I had an appointment today at the construction site with the CEO of a construction company that was recommended to me. He said he has seen a lot, but nothing like this. There is already verdigris on the interior walls, the waterproof basement is wet, the construction site unsecured, a crack in the concrete ceiling on the ground floor. He didn’t give me much hope for further construction. If at all, first save what can still be saved and renovate. The damage amount is already at least €130,000, possibly even higher if, for example, the waterproof basement is not sealed or the concrete ceiling continues to crack. Additional costs for the new company are not included.
 

Hausbau2019

2019-08-16 22:06:33
  • #3
: You are writing quite a load of crap.
 

KlausiMausi

2019-08-16 22:08:39
  • #4
No, you are the one writing about the family. Recommended BU, burned family assets.
 

KlausiMausi

2019-08-16 22:09:45
  • #5
And do they want to help you?
 

Hausbau2019

2019-08-16 22:16:45
  • #6
Sorry, but some of the answers here are really too much for me, especially from KlausiMausi, which are below the belt. I'm out. Thanks to everyone else and good luck with your construction projects.
 

Similar topics
02.02.2009Building materials are stolen at the construction site12
28.01.2010House with or without a basement? - Experiences20
05.06.2010Basement made of high perforated bricks or concrete?11
18.08.2013Massive house with basement. Is our budget enough?11
08.12.2015Construction costs for KFW70 house with basement turnkey15
03.03.2012Position controlled residential ventilation in the underground basement?16
26.10.2012External perimeter insulation floor slab, basement mold risk11
09.06.2013Costs of earthworks without basement15
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
01.07.2013Additional insulation in the Ytong basement (36 cm)14
27.07.2013Average construction time for a semi-detached house with a basement11
11.10.2018Waste on the construction site - What is tolerable?138
23.03.2020Curfew: Am I still allowed to go to the construction site in Bavaria?73
09.04.2020Visit the construction site for ventilation?17
23.08.2025Construction progress: Duplex with WU basement and developed attic814
19.08.2021House building - an eternal construction site?33
02.10.2023Floor plan single-family house ~165m² plus basement165
23.01.2024Floor plan for a single-family house with 200m² with a separate apartment 75 + basement 140m² + garage 56m²59
21.09.2022Camera / mobile phone for documentation in the workshop or construction site13

Oben