So dear ones, it continues with diligently picking out trades.
A little update in advance: I will probably really take out the windows and do them with my father-in-law.
In the end, I will get all windows in RC2 in exchange for the credit amount (thus automatically also better sound insulation) with top-mounted roller shutters on the upper floor and venetian blinds on the ground floor.
In the meantime, we also went to the sample selection with the interior door maker and the stair builder.
Surcharge for our requests from the door guy: 1500 EUR. That doesn’t sound like much now, but I would get 2,900 credited for 10 doors. Here too, I would have to get by with about 2/3 of the costs through my father-in-law.
The stair builder almost blew the roof off. He wants almost 4,500 EUR surcharge for our special requests (white lacquered, ash instead of beech, risers)! That is already more than a standard beech stair would cost completely. I had already inquired with another regional stair builder and here the complete stair in white costs between 5 and 6 TEUR, so about 1000 EUR less.
It looks like I have to take one trade after another out of my lump-sum contract right now because otherwise the surcharges will make me poor.
What do you think I should pay particular attention to going forward, especially with regard to warranty transfers, interfaces, etc.?
So topics like which trade is actually responsible for certain tasks as standard, such as silicone/acrylic joints, seals, connections?
Thanks and regards
Tolentino