So, we had an EL operation again over the weekend.
It's shocking how much muscle power it takes to uncover such a cistern. We were mostly three people, later someone else joined us. With multiple wall collapses (undermining), a half-burial, and too little working space (construction road up to 1m away), we needed about 7 hours in total until we could pull straps under the cistern.
We were about 1 hour away here:
On Monday morning, the deep foundation contractor lifted the cistern out and closed the hole in 10 minutes.
It is always impressive what real machine work is capable of achieving.
The following picture is from this morning. The construction sites seem to be prepared as far as possible.
The floor slabs are supposed to be poured by the end of next week...