Correct!


Above the left red line there is a very old shed today. This was built on the neighbor's property boundary. The xx in the drawing are meant to show that according to the old development plan, after demolition, an identical building is no longer allowed to be built on the boundaries.

In general: The architect has taken into account 3m distance areas to the neighbors on all sides in the current plans.
 

ypg

2022-08-05 18:58:40
  • #2

But the building window is also limited on the sides, isn’t it?! I read 6 meters to the west, 4 meters to the east distance. Why 3 meters?

Please excuse me if I am being critical. You have a B- or site plan, and the architect does what he wants or what you want.
We are not in "Make a wish" or "Throw away the development plan, I can't get my dream house on it."
What did the building authority say about the exceeding of the ground area in general?
 

gregman22

2022-08-05 19:23:49
  • #3

To be honest. I had 3m in mind, but maybe I was mistaken.
I saved the architect's quote "setback areas are taken into account in the plan" and therefore did not deal with it any further. However, if I subtract the setback areas 6+4m from the total width of 25-26m, the total width of the house with garage (11.10m+5.63m) roughly fits. So it seems as if that is okay.


The idea was that we now finalize a plan, submit certain additional arguments (neighboring houses) and then wait for the preliminary inquiry. Then react accordingly.
 

Elokine

2022-08-05 19:58:49
  • #4
Just my opinion: you have a great budget and there's so much more possible than just tweaking this draft a little. I believe it will never get as good as having it redone from scratch. And that by a proper architect. We were in the initial phase with 2 construction companies with employed architects. They drew us nice and absolutely livable floor plans. That would have satisfied me. Then most recently, because we liked the style of his houses so much, we went to an independent architect. And what can I say, the difference blew us away. The arrangement of the windows, the sight lines, the smart details, and the consideration of our wishes completely convinced us, and not least the honest words about some nonsensical ideas of ours. Yes, that can be more expensive and the architect wants to be paid. But your budget allows the house to end up being cool and not just nice.
 

ypg

2022-08-05 20:05:44
  • #5
But that will also come out for you if you stick to the numbers. No! 16.73 is not 15.5! What is your general contractor called? Otherwise, I already said it twice, I’m on
 

Myrna_Loy

2022-08-05 20:18:58
  • #6
I would NEVER! have a villa built for around 2 million with an existing development plan by a [GU]. That would be like taking the money for a Maserati to pimp a Tuareg.
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
19.12.2014Finding architects - but how?26
20.08.2016Should the house be planned by a general contractor or architects?30
28.02.2018Deviation from the development plan in the new construction area is possible118
29.01.2019Responsibility of the architect in case of KfW interest and further matters148
15.08.2018Basic floor area ratio / floor area ratio for plots without a development plan: How to calculate? Experiences?18
27.08.2018New building shell construction selection: Choose a company or architects?52
11.07.2019Possibility of preliminary questions to architects23
11.03.2020Architects invoice - Amount okay?13
20.10.2020NRW: Exemption procedure with minor deviation from the development plan18
13.01.2021Upcoming land purchase - questions about the development plan20
15.11.2021Wishlist for the architect32
06.01.2022Problems with architects - approval procedures18
25.04.2022Interpret building plan / is it even feasible?70
05.10.2022Unclear development plan E+D or II27
05.10.2023Single-family house ~200 sqm with double garage on a trapezoidal plot70
24.07.2023Planning with an older development plan45

Oben