Construction report single-family house 1200 €/m²

  • Erstellt am 2020-06-14 12:05:45

hegi___

2020-06-16 20:11:07
  • #1
Currently, I am working on planning the ventilation system in CAD. Afterwards, the water pipes and the drainage will follow.

This way, I want to minimize the time on the construction site and detect errors in advance.

 

danixf

2020-06-16 20:12:07
  • #2
We also invested quite a bit of labor ourselves. The "worst" part is that doing the work yourself means you spend even more time on the construction. As a result, you get even more ideas than you already had. In bed at night, you discover something on your phone – I want that. So the next day is spent implementing those little gadgets. Here, a quick wall; there, a few more sockets; and a second outdoor water tap would be quite convenient too. After 9 months, I had used up my annual vacation and 400 overtime hours. The weekends are extra on top of that. We also planned a lot at home in advance, but being on-site is really something else... Great project, in any case, and good luck. Just don’t overdo it and make sure to take a break sometimes.
 

ypg

2020-06-16 20:17:30
  • #3


okay... so neither my husband nor I can do something like that. But I am also glad that in our case it is the man who does it, who provides the warranty for it.
 

Lumpi_LE

2020-06-17 06:42:36
  • #4
No lengths reach the ground floor anymore; you have to take 2 pipes per outlet.
 

wrobel

2020-06-17 07:14:05
  • #5


Morning
That's probably just the cable routing
The design of the system certainly comes from the manufacturer or dealer.

Olli
 

hegi___

2020-06-17 08:13:54
  • #6
As long as the cable lengths are between 5-18 meters, that is not a problem. And that is the case.
 