Is there a post where the submitted plan can be seen?

You forgot the access road in the development. That will be added to the 30k.
 

Nordlichter

2024-03-01 11:37:03
  • #2
Now I have read through the whole topic and followed the development process with noticeable excitement, so I would like to wish you a as uncomplicated construction as possible and a wonderful result! With all that there is to plan, to consider and to accomplish, which can be so exhausting and also frightening, I simply wish you a lot of joy with your future home and during the development process!
Best regards
Kerstin
 

schmeissrein

2024-03-06 19:55:20
  • #3

We will not upload the submitted plans. Honestly, nothing can be changed now anyway, and we want to make the best of it. Hearing "this is stupid, I would have done it differently" afterwards only leads to frustration, and we've had enough of that in the past months. The driveway itself will of course come separately, we have factored that in, but this was mainly about cables and trenches.


Many thanks! It is truly a mammoth task for average people without expertise like us, but we are very confident that we have found the right company to guide us through it.
 

Similar topics
13.01.2016Is a 4m driveway sufficient for the garage?13
11.10.2018Parking space / driveway problem on a slope (rising from the street)12
22.03.2019Property division: Shared access via a separate plot29
15.06.2019Design driveway with grass pavers10
09.04.2020Gap in building / Access for surrounding properties / §34 Neighbor development46
30.03.2021Problem when selling the house: no access road and a biotope present31
21.08.2023Access to the planned single-family house on a rear plot13
13.09.2024Access to the carport is obstructed by a lamppost17

Oben