You can do it that way if you have a lot of time. But while a soil survey is in progress, you also use the time to look for your contracting partner. For some, it can take several months to find someone trustworthy. But of course, you can also waste your time with the thought of and around a meal.
 

Nordlys

2017-09-29 08:58:39
  • #2
You simply don’t have to understand everything about the Bavarians. If we fully understood them, we would be Bavarians too. That would be the downfall of Prussia. Karsten
 

MIA_SAN_MIA__

2017-10-12 09:42:48
  • #3
Update: The geologist was here, the soil is as expected poor... Nevertheless, we will build a basement.

An appointment with an architect is now scheduled. I have almost all contract partners except the most important one. I am still missing the shell builder. But that can only happen with a proper floor plan...


When I look at what you call beer, it’s fine the way it is...
 

matte

2017-10-12 09:51:38
  • #4
Even I, as a Bavarian, don’t understand that now...

Now you have the case that actually argues against a basement and yet you are still building one.
What case would have to occur for you to do without the basement?
 

kaho674

2017-10-12 10:04:47
  • #5
Good plan! The Saxon.
 

MIA_SAN_MIA__

2017-10-12 10:26:37
  • #6


Hm, I think that almost never happens in hindsight... Honestly, I also don't see any above-ground alternatives for the basement. At least nothing that would accommodate 10-20m² more. We then discussed in the evening and now prefer to take the money in hand...

On the lower side, we have the first rocky ground at about 2-2.50m. Groundwater is there at about 1.40m.
On the upper side, we are at about 2.50m to rocky ground and groundwater just under 2m. But the geologist also said that the ground there is no problem for a large excavator.

Since it also turned out that the height difference between the outer wall at the bottom and top is 1.5m, it wouldn't be so bad if we fill up the 1.5m.
 

Similar topics
28.01.2010House with or without a basement? - Experiences20
05.06.2010Basement made of high perforated bricks or concrete?11
18.08.2013Massive house with basement. Is our budget enough?11
08.12.2015Construction costs for KFW70 house with basement turnkey15
03.03.2012Position controlled residential ventilation in the underground basement?16
26.10.2012External perimeter insulation floor slab, basement mold risk11
09.06.2013Costs of earthworks without basement15
19.04.2013Budget for the construction of a single-family house with a WU concrete basement27
27.05.2013Cost estimation: prefabricated house, basement, carport, single garage10
01.07.2013Additional insulation in the Ytong basement (36 cm)14
27.07.2013Average construction time for a semi-detached house with a basement11
08.02.2015Floor plan single-family house, approx. 200 sqm without basement - assessment172
20.03.2015Basement for a small recording studio, or rather an extension?16
27.08.2015House with or without a basement35
28.02.2019Land planning Single-family house on a north slope with basement13
02.12.2019Single-family house (2 floors + residential basement + developed attic) approximately 200 sqm - changes162
27.01.2020Building a single-family house with/without a basement on a small plot65
31.01.2023Groundwater cost consequences experiences?11
21.03.2024Earthworks/basement construction in high groundwater areas – any experiences?28
03.04.2024Looking for information on basements with a white tank11

Oben