Phew, I’d guess mid-40s? His boss, whom we actually met, definitely early 50s.. That was another variable change. We met the architect, but it was carried out by his employee (graduate engineer), and there was simply a different basis of communication... (even though the architect said he was always involved in the planning...)
 

Schlenk-Bär

2019-09-13 08:18:11
  • #2
I didn’t dare earlier ops:. No, actually it did take me some time. And before I make such an accusation, it has to have been observable for quite a while.
 

Zaba12

2019-09-13 08:26:02
  • #3
Here, the floor plans are still "civilized". The building financing topics are a different caliber. Although emotions do come into play as soon as the OP has drawn it themselves or "co-drawn" it. Besides, the OP is still/again responding
 

Schlenk-Bär

2019-09-13 08:29:39
  • #4
Yes, that's correct. But he is in the position of having to justify himself. This course of events, which can be observed here, reminded me of many other threads. But now, enough with the off-topic.
 

Notstrom

2019-09-13 08:34:16
  • #5
Thank you... I don't feel torn apart by the discussion but I do feel somewhat guilty, although I have already summarized at least three times that it could have gone better... and once again for the colleagues who side with the architect: I was already looking for a possibility of further cooperation, which does not exist, I have accepted that, now I am looking for a way of compensation and will then hopefully close the topic halfway...
 

DASI90

2019-09-13 09:11:21
  • #6


I think you should give yourselves and the future architect a bit more time on the next attempt. As some have already pointed out, designing is to be understood as an iterative process that also takes some time. As far as I understand, it happened within 2 weeks for you? Besides, in my opinion, it’s just the way it is with architects that everyone has their own style which is then logically always found in their designs. Therefore, you should only choose an architect if you can identify with the style of their previous references.
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
30.01.2014Architect's cost estimation15
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
19.12.2014Finding architects - but how?26
08.09.2015Massive house by the architect, approximate costs?16
23.09.2015Responsibilities of the Architect in Tendering18
29.10.2015Is it normal for the purchase of land to be tied to an architect?16
19.01.2016Construction project with architects31
20.08.2016Should the house be planned by a general contractor or architects?30
10.03.2017Payment of the architect16
12.10.2017Cost of enclosed space. First draft discussed with architects27
27.10.2017Construction description by architects: Who has experience?13
07.02.2018Architect's suggestions disappointing - What next?32
16.02.2018Stress with the architect - naively signed the preliminary contract17