Hello, what most people in my opinion are not yet aware of is that a building that is supposed to achieve the EE class will probably no longer be feasible without a controlled ventilation system. In the Bundesanzeiger, under the chapter Technical Minimum Requirements, it says: When implementing efficiency houses, it must always be checked whether measures to prevent condensation and mold growth are necessary. For this purpose, a ventilation concept must be created, specifying the required outdoor air volume flow and the solution for implementation, for example using [DIN 1946-6]. The client is responsible for initiating the implementation of ventilation-related measures.
So one should pay attention to what the KfW expects in order to receive funding. The cited DIN describes, for example, as a minimum moisture protection during temporary absence. During absence, manual ventilation is not possible since no one is there.....