From my own experience, one of the two amounts needs to be significantly increased. The basement price fits if it really only means the bare basement. Planning living rooms there could already become tight.
However, the earthworks for the basement are missing from the additional construction costs. The excavation can't be distributed anywhere there, and disposal really costs a lot. Excavation, backfilling, disposal... I quickly see an additional €20,000 disappearing there.
 

WingVII

2019-10-18 19:48:27
  • #2

Okay. What is your floor area? €70,000 for a cellar of a theoretical 120sqm house seems relatively high to me. It's a minor point, but I believe one could manage with €20-25K ancillary construction costs for the plot due to short utility connections (water/electricity/telecom) (excluding earthworks).
I don’t think €100,000 is due here for cellar and ancillary construction costs, unless you create a living cellar.
 

Fuchur

2019-10-18 19:55:21
  • #3
I am not talking about my cellar, which is (unfortunately) significantly more expensive. But we have juggled offers from 5 cellar providers, 3 civil engineering companies, and several potential landfills, so at least I know the local prices. We are also not in a high-price region. It was only meant as a hint that in the end, there may not be as much financial leeway as it seems.
 

apokolok

2019-10-18 20:27:50
  • #4
Whether the basement now costs 55k or 70k doesn’t really matter. The added value on the property is simply absolutely priceless.
 

Fuchur

2019-10-18 20:32:47
  • #5
It is no longer indifferent when the missing 15T simply are not there and the Earth prevents further construction.

I see the added value the same way, but those are different things.
 

WingVII

2019-10-18 20:35:19
  • #6
In the case of the TE, there would then be 25K€ left instead of 40K€. Therefore, it should still not be a problem.
 

Similar topics
14.08.2012Build a home? Land in prospect19
18.10.2012Ancillary construction costs and general expenses for a new semi-detached house14
09.06.2013Costs of earthworks without basement15
05.02.2014Costs/planning land, additional construction costs, turnkey, etc.27
04.03.2015Budget plot and building with basement21
02.10.2018Excavation for the basement, your opinion on the cubic meters31
02.04.2019Building plot: Massive fill or better basement with excavation?28
30.09.2019200m2 single-family house for 4-5 people without a basement on a narrow plot67
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
27.06.2020Level the basement or the plot?43
27.01.2020Building a single-family house with/without a basement on a small plot65
28.07.2020Single-family house 160m2 with basement, 500m2 plot108
09.10.2020Single-family house 220 sqm with basement on 700 sqm plot41
13.10.2020Land available - ancillary construction costs, ancillary house costs, financing?34
19.10.2020Street about 50cm above the property - backfill or basement24
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
04.03.2022Property development - basement yes or no?75
08.08.2022Costs for basement excavation without disposal21
09.09.2024Floor plan design: Single-family house with basement; 560 sqm plot65
18.04.2024Floor plan design: Single-family house; with basement; 800 sqm plot10

Oben