RotorMotor
2022-08-18 08:48:29
- #1
Without a bus, your control cabinet is actually not a control cabinet, but a meter cabinet, fuse box and/or a distribution board. And it should accommodate all RCDs, circuit breakers, possibly AFDDs and meters that you need. I have not yet heard of any plans to expand the RCDs or circuit breakers later on. AFDDs are sometimes retrofitted or changed from RCD+circuit breaker to combined RCD+circuit breaker. And meters are sometimes retrofitted for e.g. photovoltaics, e-cars, ...I wanted to ask how big the control cabinet should be We are building without smart home (so no KNX)