guckuck2
2022-09-23 14:44:32
- #1
The e-UP is planned to be produced until 2025, but currently the order books are (again) closed. However, that will change. I can only recommend it ;-)
Set up a charging station near the gate because a) parking forwards is more convenient b) nose loaders/front loaders are rather rare (mostly plug-in hybrids, which I wouldn’t plan with) c) you won’t want to charge two cars every day
The supply line and fuse should be designed for 22 kW so that a second charging station could be branched off in the future. If you buy a charging station with a permanently attached charging cable – which is most of them – then take a cable longer than 7m. That way you could also charge a vehicle on the other side with the disadvantage that the cable lies behind the other vehicle. That shouldn’t be a problem in everyday life and if it is, see above (branch off second charging station)
Set up a charging station near the gate because a) parking forwards is more convenient b) nose loaders/front loaders are rather rare (mostly plug-in hybrids, which I wouldn’t plan with) c) you won’t want to charge two cars every day
The supply line and fuse should be designed for 22 kW so that a second charging station could be branched off in the future. If you buy a charging station with a permanently attached charging cable – which is most of them – then take a cable longer than 7m. That way you could also charge a vehicle on the other side with the disadvantage that the cable lies behind the other vehicle. That shouldn’t be a problem in everyday life and if it is, see above (branch off second charging station)