100 euros is for other people, financing or not financing... ;-)

But yes, I understand what you mean, we contributed 40,000 euros less equity than planned for a 0.2% interest rate improvement...
 

BananaJoe86

2023-12-14 08:16:54
  • #2
Climate-friendly new construction – residential building (297, 298) was completed this year because funds ran out. 300 is still ongoing.
 

Schnubbihh

2024-01-03 15:32:42
  • #3
Just for fun, I just compared the KFW 300 funding with and without QNG. It looks like this in my case with 3 children: - Loan of €200k (without QNG) vs. €250k (with QNG) - Interest savings for the additional €50k calculated over 10 years approx. €12-13k - Assumptions: 3.5% market interest rate, KFW interest rate of 0.25% (25-year term) - Now, from a business perspective, this interest saving would have to be "discounted" for each year since it does not become effective immediately, leaving a present value of approx. €11k - Now costs of €10.8k arise from the QNG certification alone in my case; additional costs for groundwork/wall paints etc. not yet considered - Additionally, after the 10-year KFW fixed interest period, a higher remaining balance remains which will have to be financed at a higher interest rate for the follow-up financing Conclusion: KFW 300 with QNG is definitely not worthwhile in my case (at least economically). Do you have similar experiences or can you understand my calculation?
 

BananaJoe86

2024-01-03 17:04:17
  • #4
I see it the same way as you. We only took 170k because we wanted to avoid the QNG certification, the house building already causes enough stress. Likewise, we wanted to minimize the risk of not being able to handle the interest rate increase in 10 years.

Do you know what must still be considered in the case of "without QNG" when building after receiving the confirmation for the application (BZA)? Do you even have to pay attention to the materials used in the interior finishing? Are there any other restrictions or is the job of the energy inspector basically done?

Regards
 

Schnubbihh

2024-01-03 17:07:19
  • #5


To my knowledge, the pure KFW40 subsidy only relates to the energy consumption of the house, i.e. insulation and heating technology. Interior fittings are no longer considered here.
 

BananaJoe86

2024-01-03 17:13:55
  • #6

The life cycle analysis is still required regarding CO2 emissions. But to my knowledge, this is already completed with the confirmation of the application (BZA) generation.
 

Similar topics
10.05.2016KfW funding for two-family house26
10.12.2017Second residential unit in the house due to KfW funding 15313
14.02.2024Bafa funding for heat pumps will be discontinued as of 31.12.2020.508
18.11.2021KfW funding for KfW 40 Plus houses from now and from 01.07.202157
21.03.2021Land registry later than planned - save KfW funding18
08.05.2021New building with granny flat - general contractor restricts rental and KfW funding51
31.08.2021Kfw 40 Plus funding - Ban on feed-in tariff?21
12.11.2021Exclusion of funding / Purchase contract signed before KFW grant10
14.06.2022KfW BEG funding stopped 261, 262, 263, 264, 461, 463, 4641239
07.03.2024New funding for family home ownership201
19.07.2023Double KFW 297 funding through two residential units?16
19.07.2024Application KfW 442 Solar Power for Electric Cars42
06.12.2023Electricity costs for a KfW QNG 40 house19
29.03.2024Lowering the KfW level - impact on loan amount?13
30.03.2024KFW 300 - Qng - Prefabricated house - Rhineland-Palatinate15
16.08.2024Buy land with cash, construction through KfW/NRW Bank27
31.10.2024KFW 300 Funding - Attractiveness23
11.01.2025KfW 300 funding upon disposal of real estate ownership10

Oben