So, today we went to the roofer and chose our tiles. After that we went to the construction site. The ground floor ceiling is in place, the staircase is installed. Thank God the bricklayers put foil over the ceiling and closed all openings in the house, because when we were there the first snow came. Hopefully it can continue next week. Because we are now under some pressure due to the [Photovoltaic system]. During the year (no one knows exactly when) the cap for the feed-in tariff will be reached. If we put the system into operation too late, the investment will never pay off. I am actually considering canceling the whole thing. Because it is not profitable with self-consumption alone.
 

fskscorp

2020-01-19 13:08:57
  • #2
I share your thoughts. I also looked into it this week and since we won’t be commissioning the photovoltaic system before summer 2020 anyway, I will wait and see what happens. Using pure common sense, I would say they can’t completely put it on hold given the current discussions... but who knows! We haven’t assigned the kitchen yet because we want to wait for an appointment on Wednesday. MM does have his great discount offers and also did the classic “I’ll ask the boss what’s still possible,” but in my opinion, it’s still too expensive.

Could you give me, preferably via PM, a brief overview of the procedure with DHI regarding appointments? Like roughly how the process was in preparation on your end. That would be cool so I know what I can prepare, how, and when. Thanks!
 

CrazyChris

2020-01-19 13:23:07
  • #3
For PN I still need 12 posts. First of all, you have to wait for the final construction planning. Otherwise, all the utility providers need to be organized. DHI either does this themselves or at least prepares it for you. As soon as the building application is approved and the construction planning is available, it starts. Only when the ground floor is standing do you need to decide on electrical installation, roof, etc. We still haven’t planned a finished kitchen to this day. But since we know where the appliances, etc. will go, that’s not a problem. We will take care of the tiles in the next few weeks. As a rule, DHI will get in touch when something is due. It can also be short notice though. We are now pushing through with the photovoltaics. Maybe we can get the system up and running in March briefly over the construction power, that is enough to secure the funding. Hopefully the electrician cooperates...
 

fskscorp

2020-01-19 13:35:48
  • #4

We can manage that

OK... so I'll keep quiet now until the building application is approved and Dirk has finished the work planning. As soon as the building permit is granted, I want to carry out the earthworks in suitable weather. For that, I still need to complete the BAFA application because I have to order and install the trench collector.
OK, how the kitchen is coming is already fixed, if necessary I would draw up my own plan.
When did you receive a contract from DHI?
I also wanted to finalize the tiles for the bathrooms so that we can order the right bathroom furniture. I’d rather not have to change that later.
I’m keeping my fingers crossed for you with the photovoltaic system. I guess I’ll have to wait and, if necessary, only install the pre-installation.

And thanks in advance for your info!
 

CrazyChris

2020-01-19 21:39:04
  • #5
We will clarify the contract via PM.

Do you already have the soil survey and structural analysis?
Are you only excavating or also doing gravel etc.? Because compressive strength needs to be checked.
 

fskscorp

2020-01-19 21:49:00
  • #6
The soil report has been available since December. The structural analysis is coming tomorrow. I am excavating and partially filling. Then I will do the sewer connection and gravel for the floor slab. After that, planum acceptance by means of plate load test.
 

Similar topics
18.01.2015New construction Kfw70 underfloor heating and tiles11
28.02.2015Building application submitted/open detailed questions/looking forward to suggestions39
08.03.2016Help needed for flooring, especially. Tiles vs. parquet33
18.04.2016Tiles vs Laminate/Parke17
30.05.2016KfW55: Gas or air-water heat pump with/without photovoltaics17
15.02.2018Stone wall made of stone/stone slabs? Living room / kitchen69
06.08.2016Parquet or tiles with cats - are there concerns?11
23.10.2016Bathroom with few tiles?16
13.10.2016Removing tiles from concrete16
27.10.2016Combination of tiles and parquet in the living room with an open kitchen30
09.09.2017Real wood in new buildings: dining, living, kitchen, and hallway10
01.11.2017Underfloor heating - Better to install tiles or laminate?28
26.02.2018Which flooring - tiles or vinyl in the living/dining area?18
10.11.2019Tiles or vinyl in kitchen and hallway19
10.11.2021Photovoltaic system: Costs, saving potential? - Experiences?240
06.10.2021Photovoltaic system / heat pump, do you have 2 meters?55
31.01.2022Consultation for photovoltaic system227
02.03.2023Recovering value-added tax on photovoltaics through the general contractor10
09.01.2025Vinyl flooring in the kitchen / Beam ceiling sagged / Should I lay it on tiles?11
02.06.2025Help with photovoltaic decision41

Oben