Hello, @Timo there was still so much in there
The house is looking better and better now that the first interior walls have plaster on them
@ Martin I think you made the right decision

Regards
Philippe
 

BaTi_G

2015-03-25 11:47:52
  • #2
Good day everyone,

if you are getting a wood-burning stove, I have something interesting for you that you need for operating the extractor hood (exhaust). More details gladly via PM

Regarding the construction status: the hut is sealed
All windows are in place and the construction door is also installed.

Best regards
Timo

-------------

Hello Timo,

I have removed the link, please observe the forum rules. Thank you!

Regards from the Rhineland
Construction expert
 

Speedy-OTW

2015-03-31 15:24:23
  • #3
Hello everyone, how is it going with you??? The weather is cooperating somewhat
Here, everything inside and outside is now plastered and the scaffolding is finally gone. Everything already looks really great
Over Easter, we will lay the insulation for the underfloor heating ourselves, so that afterwards the heating engineer can lay the pipes directly in the rooms.

Greetings to all!!!
 

Jochen104

2015-03-31 16:25:40
  • #4
Hello, that sounds really good! Today - despite the awful weather - our ground floor ceiling arrived. Tomorrow morning we will mark the electrical wiring on the ground floor. We also want to install the insulation for the underfloor heating ourselves. You can report how it worked out. I'm really looking forward to doing something myself
 

BaTi_G

2015-03-31 21:18:04
  • #5
Exactly Philippe, report how it went with the insulation.

@ Jochen, I felt the same way... painting the fire barrier was finally something to do....
 

Jochen104

2015-04-01 12:04:16
  • #6
This morning there was really a lot of activity on the construction site. While we were planning the electrical distribution, preparations for pouring the ground floor ceiling were being made above us. Just as we finished the electrical planning, three more electricians arrived and immediately got to work. Tomorrow at noon the ceiling is supposed to be concreted. It's really great how everything fits together. @ Timo and Philippe: Did you organize a topping-out ceremony?
 

Similar topics
24.07.2013Additional costs due to underfloor heating11
07.04.2014Planning attic conversion in new construction - heating, ventilation, insulation?14
13.08.2014Underfloor heating grooving - experiences?19
27.11.2014Questions about underfloor heating with geothermal energy40
18.01.2016Height for underfloor heating10
15.04.2016Is the cost of underfloor heating completely exaggerated?44
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.10.2016Control floor heating19
27.11.2016Double insulation below and above the floor slab?10
28.08.2017Old building renovation - gas heating + radiators or underfloor heating?10
12.11.2017Underfloor heating / Wall heating / Ceiling heating - Alternatives?18
27.12.2017Underfloor heating heating demand with at least 60 mm screed30
26.02.2018Insulation under reinforced concrete floor slab KFW5520
20.06.2018The basement should become warmer - underfloor heating, insulation?11
02.02.2020Insulation under the floor slab - Is it sensible? Experiences39
04.02.2020Installation of additional insulation for underfloor heating - cables lie on the raw floor slab25
22.02.2021Insulation of the ground floor / if applicable, underfloor heating12
24.08.2021Cooling with heat pump via underfloor heating?117
26.03.2022Which is more sensible: heat pump or insulation?33
22.11.2023Very low construction height with underfloor heating in old buildings11

Oben