Of course, one should not assume this value... that's why we told our architect right away that we would like a reasonable calculation including all ancillary building costs. There was no upscaling in that sense for us. Land costs were already known, and we set fixed values for the kitchen and outdoor facilities, which we then adhered to.
However, I must say that some values here that are always called "standard" are in part far above our expenses. Some examples of our costs: Earthworks: €4,682.26 House connections (electricity, water, telecom): €3,044.65 Engineering costs (architect, structural engineer, surveyor): €16,984.50 Painting work + flooring as do-it-yourself (only material): approx. €4,500–5,000