Is it the same with the water pipes?
For the pipes coming from the wall, the connection pipes have also already been laid on the floor. The same was true for the drainage system at our new neighbor who is also currently building. The pipes are also nailed to the floor.
But for the drainage, it is correct that the plumber first pulls the pipes, then the wall is plastered, and then the insulation for the underfloor heating is laid, right?
Otherwise, the insulation would be completely ruined by the plasterers.